top of page

Ready Mix - Concrete

Your Truck, Our Trailer

We provide you with color, Stamps, tools, forms, sealers and the knowledge to make your project a success.
Training Videos

PRICING

  • 1/4 yd

  • 1/2 yd

  • 3/4 yd

  • 1 yd

  • 1 1/4 yd

  • 1 1/2 yd

  • 1 3/4 yd

 $114
$133
$173
$208
$259
$312
$364

MUST HAVE

  • Valid driver's license

  • Current proof of insurance

  • Proper size tow vehicle

    • 1 yd trailer - 1/2 ton

    • 1 3/4 trailer  3/4 ton

  • 2" ball 4 prong flat plug

  • NO bumper pull​

  • Trailer deposit of $150

  • 2hrs rental time included 

    • (25$/hr after)

Training Video

All Videos

All Videos

Watch Now

 Quality Concrete Starts With The Proper Ad Mixtures

Hot Weather -

Delay Admixtures

These slow down the rate set of freshly placed concrete, offsetting the accelerating effects of high temperatures by preventing premature stiffening and gives the customer more time to place concrete.

Cold Weather - Accelerating Admixtures 

These are essential to help offset the effects of low temperatures by increasing the rate of cement hydration. This aids in the concrete setting time and the development of early strength of the concrete. Dose rates of accelerator vary depending on the ambient temperature at the job site.

Air Entrainment

The primary purpose of air entrainment is to increase the durability of the hardened concrete, especially in climates subject to freeze-thaw; the secondary purpose is to increase workability of the concrete while in a plastic state in concrete. It is used for exterior applications.

Water Reducing Super Plastisizer 

Water reducers are special chemical products added to a concrete mixture before it is poured. They are from the same family of products as retarders... increasing the concrete strength by up to 25% (as less water is required for the concrete mixture to remain workable)

31 W. Washington Ave. 
Yakima, WA. 98903

(509) 469-3836

bottom of page